No caption
IMG_2789.JPG
Details
Friday, January 30, 2026 · 3:19 PM
39.39254, -120.02258· 1634m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1949sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.5155
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:30
GPSDestBearing189.8779
GPSDestBearingRefTrue North
GPSHPositioningError5.1730
GPSImgDirection189.8779
GPSImgDirectionRefT
GPSSpeed0.4848
GPSSpeedRefK
GPSTimeStamp23:19:16
HostComputeriPhone 16 Pro
latitude39.3925
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-30T15:19:16.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.9288
Software26.2.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized723
SubSecTimeOriginal723
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a sloped area with bare soil erosion control on the left, sloping down to a gravel and rock area on the right. A covered pile is located on the right side, suggesting material storage. The landscape includes trees and distant snow-covered hills, with no construction activity in progress at this moment.
swppp-erosion-control
bare soil and gravel with rocks clear weather, natural daylight open and accessible with no visible congestion
No visible safety features or PPE observed in frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
site-gradingearth-moving
excavator
2m
pipeline installation
duct-bank-installationconduit-laying
pickup truck
2m
pipeline installation
conduit-installationduct-bank-installation
pvc pipes
2m
pipeline installation
duct-bank-installationtrenching
PVC conduits
3m
site grading
site-gradingmaterial-staging
loader
3m
site grading
site-gradingcompacting
roller compactor
3m
site grading
soil-preparationmaterial-handling
skid steer loader
3m
trenching
trenchingduct-bank-installation
excavator
3m
site grading
road-gradingcompaction
soil-compactor
4m
site grading
site-levelingearth-moving
backhoe-loader