No caption
IMG_7696.JPG
Details
Friday, May 9, 2025 · 10:08 AM
39.39181, -120.02157· 1640m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/5319sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.0235
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:09
GPSDestBearing325.0626
GPSDestBearingRefTrue North
GPSHPositioningError32.0928
GPSImgDirection325.0626
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:8:39
HostComputeriPhone 16 Pro
latitude39.3918
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-05-09T10:08:40.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.3770
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized944
SubSecTimeOriginal944
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows trenching activities with a worker standing in a trench. Several conduits are positioned horizontally along the trench, partially set in place. The trench is filled with soil and appears to be in the process of backfilling. The worker is using a shovel to move soil around the conduit area.
trenching
dirt trench with loose soil clear sunlight open with visible access for worker
PPE is visible; open trench presents potential fall hazard.
Analyzed Apr 21, 2026
Nearby Photos
3m
swppp erosion control
slope-stabilizationerosion-control
erosion-control-blanlets
5m
trenching
trenchingpipe-laying
excavated-soil
5m
swppp erosion control
erosion-controlroad-maintenance
5m
excavation
excavationearthwork
excavator
7m
excavation
excavationtrench
9m
trenching
trenchingexcavation
excavator
10m
site grading
gradingaccess-road-construction
excavator
10m
trenching
trenching-operationexcavator
excavator
11m
site grading
backfillsite-prep
soil
12m
trenching
trenchingtrench