No caption
IMG_7182.JPG
Details
Monday, April 14, 2025 · 2:49 PM
39.39173, -120.02160· 1673m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1353sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.8608
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:04:14
GPSDestBearing196.8357
GPSDestBearingRefTrue North
GPSHPositioningError14.0521
GPSImgDirection196.8357
GPSImgDirectionRefT
GPSSpeed0.2102
GPSSpeedRefK
GPSTimeStamp21:49:23
HostComputeriPhone 16 Pro
latitude39.3917
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-04-14T14:49:24.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.4021
Software18.5
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized632
SubSecTimeOriginal632
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trenching operation with a worker standing near an excavator. The excavator is actively digging or moving soil and rocks. The worker is wearing visible safety gear including a hard hat and high-visibility vest. The area is outdoors with trees in the background and a dirt surface.
trenching
dirt and rock clear weather with daylight adequate access for machinery
Safety gear such as hard hats and hi-vis vests are visible, but no additional safety controls are in place.
Analyzed Apr 21, 2026
Nearby Photos
5m
excavation
electric-line-cautionwarning-tape
warning-tape
5m
trenching
trenchingexcavation
excavator
7m
site grading
backfillsite-prep
soil
7m
pipeline installation
pipeline-installationpipe-assembly
assembly tools
7m
trenching
trenchingpipeline-presentation
blue piping
7m
trenching
trenchingsoil
excavator
7m
swppp erosion control
slope-stabilizationerosion-control
erosion-control-blanlets
8m
pipeline installation
pipeline-installationpipe-laying
blue-pipes
8m
site grading
gradingearth-moving
excavator
8m
excavation
excavationconduit-installation
excavator