No caption
IMG_6874.JPG
Details
Wednesday, March 26, 2025 · 8:14 AM
39.39186, -120.02167· 1675m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/193sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue4.7621
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:03:26
GPSDestBearing264.7471
GPSDestBearingRefTrue North
GPSHPositioningError460.7006
GPSImgDirection264.7471
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp15:14:1
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-03-26T08:14:04.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.5962
Software18.4
SubjectArea{"0":2017,"1":1508,"2":1161,"3":665}
SubSecTimeDigitized025
SubSecTimeOriginal025
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An excavator is positioned on a dirt access road between rocky embankments, possibly engaged in grading. A yellow container is visible in the background. The road shows clear tire tracks, and the environment is surrounded by trees. The work appears to involve shaping or modifying the access path.
site-grading
dirt road with tire tracks, rocky embankments daytime with natural light clear access on dirt road
No specific safety controls are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
trenching
trenchingexcavation
excavator
5m
excavation
excavationearthwork
excavator
5m
trenching
trenchingpipe-laying
excavated-soil
6m
excavation
excavationtrench
8m
swppp erosion control
erosion-controlroad-maintenance
8m
swppp erosion control
erosion-controlswppp-compliance
erosion control blanket
9m
swppp erosion control
erosion-controlwattle-placement
wattles
9m
trenching
trenchingearthwork
hand rake
9m
trenching
trenchingduct-bank-installation
pipes
9m
pipeline installation
conduit-installationtrenching
excavator