No caption
IMG_7832.JPG
Details
Friday, May 16, 2025 · 2:44 PM
39.39343, -120.02360· 1640m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4167sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.6232
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:16
GPSDestBearing201.9372
GPSDestBearingRefTrue North
GPSHPositioningError335.7579
GPSImgDirection201.9372
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:44:27
HostComputeriPhone 16 Pro
latitude39.3934
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0236
MeteringModePattern
ModifyDate2025-05-16T14:44:30.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.0247
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized218
SubSecTimeOriginal218
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an open trench with orange safety fencing along its edge. A yellow excavator is positioned on the right side, actively involved in earthwork. A yellow-black truck is parked on the left. The area is surrounded by dirt and rocks, indicating ongoing excavation activities.
trenching
dirt and rocks partly cloudy open, with visible trench and machinery
Safety barriers and open trench visible; PPE not visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
10m
trenching
trenchingpipe-installation
excavator
16m
site grading
earth-movingsite-preparation
front-loader
24m
swppp erosion control
slope-stabilizationerosion-control
hand-tool
24m
trenching
trenchingpipeline-preparation
logs
27m
site grading
compactionsite-preparation
roller
27m
trenching
trenchingduct-bank-installation
roller compactor
35m
trenching
trenchingearth-moving
loose dirt
35m
trenching
trenchingpipe-installation
soil
36m
site grading
site-gradingsoil-compaction
compaction-roller
36m
trenching
trenchingexcavation
excavator