No caption
IMG_7960.JPG
Details
Thursday, May 22, 2025 · 1:26 PM
39.39330, -120.02333· 1631m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4975sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.9982
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:22
GPSDestBearing3.7227
GPSDestBearingRefTrue North
GPSHPositioningError256.6490
GPSImgDirection3.7227
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:26:27
HostComputeriPhone 16 Pro
latitude39.3933
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0233
MeteringModePattern
ModifyDate2025-05-22T13:26:29.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.2805
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized020
SubSecTimeOriginal020
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image captures an active trenching area with installed duct banks visible in the trench. There is a roller compactor on the dirt road, and safety cones are placed near the trench edge. A structure surrounded by orange fencing is also visible. The site is in a rural area with trees and hills in the background.
trenching
trench with soil and rock clear weather with bright lighting open access with some congestion visible near fenced area
Safety controls like fencing and cones are visible, but PPE is not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
8m
swppp erosion control
slope-stabilizationerosion-control
hand-tool
11m
trenching
trenchingpipeline-preparation
logs
14m
site grading
compactionsite-preparation
roller
16m
pipeline installation
pipeline-installationpipe-laying
small excavator
16m
site grading
earth-movingsite-preparation
front-loader
25m
trenching
trenchingpipe-installation
excavator
27m
trenching
trenchingexcavation
excavator
30m
trenching
trenchingearth-moving
loose dirt
30m
swppp erosion control
pipe-cuttingchain-suspension
trailer
31m
trenching
trenchingpipeline-marking
concrete-manhole-cover