No caption
IMG_0731.JPG
Details
Monday, October 6, 2025 · 9:20 AM
39.39326, -120.02344· 1642m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue4.7183
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:06
GPSDestBearing38.3595
GPSDestBearingRefTrue North
GPSHPositioningError66.5096
GPSImgDirection38.3595
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp16:19:57
HostComputeriPhone 16 Pro
latitude39.3933
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0234
MeteringModePattern
ModifyDate2025-10-06T09:20:00.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.0.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized812
SubSecTimeOriginal812
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench running through a wooded area with loose soil and rock excavation. A worker is visible at the far end of the trench. Piles of logs and other materials are staged on the left, and a covered object is on the right. This appears to be part of a trenching project potentially for pipeline installation.
trenching
excavated soil and rock clear daylight materials staged on ground near trench
Safety equipment, such as hard hats and vests, are visible; trench hazards present.
Analyzed Apr 21, 2026
Nearby Photos
11m
trenching
trenchingduct-bank-installation
roller compactor
16m
swppp erosion control
slope-stabilizationerosion-control
hand-tool
20m
site grading
earth-movingsite-preparation
front-loader
23m
site grading
compactionsite-preparation
roller
24m
trenching
trenchingexcavation
excavator
26m
trenching
trenchingpipe-installation
excavator
26m
pipeline installation
pipeline-installationpipe-laying
small excavator
32m
swppp erosion control
pipe-cuttingchain-suspension
trailer
38m
trenching
trenchingpipe-laying
skid-steer loader
38m
trenching
trenchingexcavation
skid-steer-loader