WEST/SIERRA CENTER UNDERGROUND UTILITY WORK
Over the 48 days, a construction site progressed from initial groundwork to the near completion of a pipeline installation. The site started with access to underground cables and ended with the area being graded, indicating that surface restoration is occurring.
Over the five-day period, significant progress was made with trenching and installation of infrastructure as pipes were laid and covered. The area was actively excavated, with backfilling and surface preparation visible towards the end of the series.
Over the 38-day period, the site saw significant progress, including trench excavation, pipe installation, and preliminary backfilling. By the end, structural elements are in place, signifying near completion of underground work.