No caption
IMG_0571.JPG
Details
Tuesday, September 30, 2025 · 2:49 PM
39.39334, -120.02316· 1637m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2299sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.7838
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:30
GPSDestBearing194.1640
GPSDestBearingRefTrue North
GPSHPositioningError108.4412
GPSImgDirection194.1640
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:48:58
HostComputeriPhone 16 Pro
latitude39.3933
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0232
MeteringModePattern
ModifyDate2025-09-30T14:49:01.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.1667
Software26.0
SubjectArea{"0":2861,"1":2135,"2":3142,"3":1881}
SubSecTimeDigitized436
SubSecTimeOriginal436
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers are inside an open trench working on pipeline installation. Blue and white pipes are visible along with a small excavator in the background. There are caution tapes and cones marking the site perimeter. Construction tools are scattered around the trench, indicating active work.
pipeline-installation
soil and gravel trench daylight clear access with some congestion due to equipment
Basic safety controls such as caution tape and cones are used, and PPE is worn by workers.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
15m
site grading
compactionsite-preparation
roller
15m
swppp erosion control
slope-stabilizationerosion-control
hand-tool
16m
trenching
trenchingduct-bank-installation
roller compactor
17m
other
fire-hydrant-maintenancetraffic-control
heavy machinery
20m
trenching
trenchingroadside-excavation
excavator
22m
trenching
trenchingpipeline-marking
concrete-manhole-cover
24m
site grading
earth-movingsite-preparation
front-loader
25m
trenching
trenchingexcavation
skid-steer-loader
25m
trenching
trenchingpipe-laying
skid-steer loader
25m
trenching
trenchingearth-moving
loose dirt