No caption
IMG_9862.JPG
Details
Friday, August 29, 2025 · 2:04 PM
39.39199, -120.02248· 1634m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3891sISO 100
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.2700
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:08:29
GPSDestBearing350.2906
GPSDestBearingRefTrue North
GPSHPositioningError12.5151
GPSImgDirection350.2906
GPSImgDirectionRefT
GPSSpeed0.1883
GPSSpeedRefK
GPSTimeStamp21:4:42
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0225
MeteringModePattern
ModifyDate2025-08-29T14:04:42.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software18.6.1
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized801
SubSecTimeOriginal801
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavation site with an open trench running through the center. Pipes are staged along the right side of the trench, and large logs are stacked nearby. Two pieces of heavy machinery, including an excavator, are present with workers in hi-vis gear. The site is surrounded by natural terrain and trees.
trenching
exposed soil and open trench daylight with overcast sky pipes staged on side, open trench with room for machinery operation
Safety controls such as PPE are visible, but no trench boxes or barriers are seen.
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipeline-staging
construction machinery
4m
swppp erosion control
erosion-controlswppp-implementation
bulldozer
4m
site grading
gradingmaterial-spreading
compact track loader
4m
swppp erosion control
erosion-control-materialscoir-rolls
red-vehicle
5m
trenching
trenchingutility-installation
soil
5m
trenching
trenchingsoil-compaction
compactor
5m
trenching
trenchingtrench
excavator
5m
swppp erosion control
erosion-controlslope-stabilization
soil
5m
swppp erosion control
swppperosion-control
excavator
6m
site grading
site-accessgrading