No caption
IMG_8390.JPG
Details
Monday, June 16, 2025 · 1:34 PM
39.39204, -120.02249· 1637m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/6024sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.0896
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:06:16
GPSDestBearing340.3041
GPSDestBearingRefTrue North
GPSHPositioningError3.2290
GPSImgDirection340.3041
GPSImgDirectionRefT
GPSSpeed0.3274
GPSSpeedRefK
GPSTimeStamp20:34:53
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0225
MeteringModePattern
ModifyDate2025-06-16T13:34:53.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.5565
Software18.5
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized713
SubSecTimeOriginal713
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction site with an open trench running through the center. An excavator is positioned at the end of the trench loading soil into a nearby dump truck. Timber logs are stacked to the side, and loose soil is visible throughout. The work appears to be in an early phase of trenching.
trenching
soil and open trench bright, sunny conditions staging of materials visible with stacked logs
Safety features such as barriers or caution tapes are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingsoil-compaction
compactor
2m
swppp erosion control
erosion-controlslope-stabilization
soil
3m
swppp erosion control
erosion-controlswppp-implementation
bulldozer
3m
site grading
gradingmaterial-spreading
compact track loader
3m
trenching
trenchingearth-moving
excavator
4m
pipeline installation
pipe-installationtrench-pipeline-work
pipes
4m
site grading
land-clearingdebris-removal
excavator
4m
trenching
trenchingearthmoving
excavators
4m
pipeline installation
duct-bank-installationconduit-laying
pvc-conduits
4m
trenching
trenchingearthwork
excavator