No caption
IMG_9082.JPG
Details
Friday, August 1, 2025 · 11:06 AM
39.39410, -120.02268· 1642m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1464sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.2984
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:08:01
GPSDestBearing246.1208
GPSDestBearingRefTrue North
GPSHPositioningError5.0688
GPSImgDirection246.1208
GPSImgDirectionRefT
GPSSpeed0.1597
GPSSpeedRefK
GPSTimeStamp18:6:43
HostComputeriPhone 16 Pro
latitude39.3941
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-08-01T11:06:45.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5158
Software18.6
SubjectArea{"0":2003,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized268
SubSecTimeOriginal268
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A worker in a hi-vis vest and hard hat uses a shovel near a trench. Another person stands nearby, monitoring the activity. The site shows excavation with an excavator partially visible. A tripod survey instrument is set up near the edge, suggesting layout or measurement work. The ground is uneven with gravel overlaying exposed earth.
excavation
gravel and earth trench area bright sunlight open outdoor area with existing vegetation
Personnel are wearing appropriate PPE; fence is visible as a site control.
Analyzed Apr 21, 2026
Nearby Photos
1m
paving surface restoration
pavingtraffic-control
truck
1m
trenching
trenchingutility-marking
backhoe
2m
paving surface restoration
pavement-patchingroad-marking
asphalt
2m
paving surface restoration
road-surface-patchingasphalt-patching
compacting-machine
2m
excavation
utility-potholingpothole-excavation
truck
2m
trenching
trenchingpipe-installation
truck
3m
survey layout
survey-layouttrenching
excavator
3m
backfill
backfillsoil-placement
front-loader
3m
trenching
trenchingsoil-compaction
truck
3m
excavation
pothole-utility-locatingtrenching
excavator