No caption
IMG_0800.JPG
Details
Wednesday, October 8, 2025 · 3:41 PM
39.39195, -120.02184· 1658m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2410sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.6944
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:08
GPSDestBearing69.3778
GPSDestBearingRefTrue North
GPSHPositioningError3.6483
GPSImgDirection69.3778
GPSImgDirectionRefT
GPSSpeed0.5419
GPSSpeedRefK
GPSTimeStamp22:41:56
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0218
MeteringModePattern
ModifyDate2025-10-08T15:41:57.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.2346
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized842
SubSecTimeOriginal842
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a silt fence running along the left side of the dirt path, and a green mesh structure stands in the middle. Sparse soil and rocky terrain dominate the foreground, surrounded by trees in the background. This setup appears related to implementing erosion control strategies, possibly as part of SWPPP measures.
swppp-erosion-control
sparse soil and rocky terrain sunny with clear conditions clear path with no obstruction
Safety controls like fencing are visible; no PPE observed.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
pipeline installation
pipe-installationslope-installation
sandy soil
3m
site grading
site-gradingtrees
grading machinery
3m
trenching
trenchingtrench
3m
pipeline installation
pipeline-installationtrenching
yellow construction equipment
3m
trenching
trenchingexcavation-activity
excavator
3m
trenching
trenchingexcavator
excavator
4m
site grading
site-gradingslope-work
lift or machinery near trees
4m
trenching
trenchingutility-trenching
excavator
4m
pipeline installation
duct-bank-installationpipe-staging
shovel
5m
pipeline installation
trenchingpipeline-installation
hand-tools