No caption
IMG_7097.JPG
Details
Thursday, April 10, 2025 · 2:00 PM
39.39217, -120.02220· 1650m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/779sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.4175
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:10
GPSDestBearing103.9902
GPSDestBearingRefTrue North
GPSHPositioningError33.8277
GPSImgDirection103.9902
GPSImgDirectionRefT
GPSSpeed1.7131
GPSSpeedRefK
GPSTimeStamp21:0:10
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-04-10T14:00:10.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.6063
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized979
SubSecTimeOriginal979
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavator positioned at the bottom of a slope with sparse vegetation and rocks. The surrounding area consists of trees and grass, typical of a forested landscape in Floriston, CA. The excavator appears to be idle on this uneven ground.
site-grading
rocky soil with slope partly cloudy daylight limited access on uneven terrain
No visible safety features in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
excavation
earthmovingland-clearing
excavator
3m
pipeline installation
duct-bank-installationinspection
concrete-junction-box
7m
pipeline installation
piping-installationpipe-encasement
concrete
8m
trenching
trenchingearthwork
earth-moving-machine
8m
pipeline installation
pipeline-connectionpipeline-inspection
pipes
9m
trenching
trenchingutility-marking
excavator
9m
excavation
excavationearth-moving
excavator
11m
trenching
trenchingpipe-preparation
excavator
11m
swppp erosion control
erosion-controlsoil-stabilization
soil
13m
pipeline installation
flange-installationpipe-connection
flanges