No caption
IMG_7752.JPG
Details
Monday, May 12, 2025 · 2:23 PM
39.39218, -120.02210· 1652m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/695sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.1195
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:12
GPSDestBearing259.3499
GPSDestBearingRefTrue North
GPSHPositioningError165.4497
GPSImgDirection259.3499
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:23:30
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0221
MeteringModePattern
ModifyDate2025-05-12T14:23:32.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.4417
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized668
SubSecTimeOriginal668
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an active trenching operation with a tracked excavator positioned on the right side. Red warning tapes marked 'BURIED ELECTRIC LINE BELOW' are laid along the trench path. The trench is dug into dirt and is bordered by uneven ground and nearby foliage in a wooded area.
trenching
dirt overcast daylight trench area with adjacent dirt pile and heavy equipment
The trench is marked with warning tape, but no personal protective equipment is visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
excavation
excavationearth-moving
excavator
5m
pipeline installation
duct-bank-installationinspection
concrete-junction-box
6m
trenching
trenchingpipe-preparation
excavator
7m
mechanical installation
tank-installationmechanical-work
crane
7m
mechanical installation
tank-installationmechanical-assembly
crane
9m
site grading
site-gradingexcavation
excavator
9m
pipeline installation
duct-bank-installationconduit-laying
soil
9m
pipeline installation
piping-installationpipe-encasement
concrete
10m
survey layout
soil-testingsite-inspection
handheld-device
10m
pipeline installation
conduit-installationpipe-laying
shovel