No caption
IMG_8710.JPG
Details
Thursday, July 10, 2025 · 9:04 AM
39.39217, -120.02216· 1649m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/323sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.9053
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:10
GPSDestBearing133.0903
GPSDestBearingRefTrue North
GPSHPositioningError38.8480
GPSImgDirection133.0903
GPSImgDirectionRefT
GPSSpeed3.1530
GPSSpeedRefK
GPSTimeStamp16:4:22
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo6.7650, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-07-10T09:04:22.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.3368
Software18.5
SubjectArea{"0":2849,"1":2137,"2":3291,"3":1884}
SubSecTimeDigitized867
SubSecTimeOriginal867
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker in a trench working with their head inside a concrete junction box along a duct bank. Multiple pipes run through the box and extend into the trench. The trench features rough, uneven soil walls. The worker is wearing a hard hat and a hi-vis vest, indicating safety precautions.
pipeline-installation
loose soil and open trench bright daylight limited access due to trench depth and excavation
PPE is visible, and caution tape marks the area, but the open trench poses a potential hazard.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
site grading
site-gradingexcavation
excavator
5m
trenching
trenchingutility-marking
excavator
6m
excavation
earthmovingland-clearing
excavator
6m
pipeline installation
piping-installationpipe-encasement
concrete
7m
excavation
excavationearth-moving
excavator
8m
trenching
trenchingpipe-preparation
excavator
9m
pipeline installation
pipeline-connectionpipeline-inspection
pipes
9m
trenching
trenchingearthwork
earth-moving-machine
12m
swppp erosion control
erosion-controlsoil-stabilization
soil
12m
mechanical installation
tank-installationmechanical-assembly
crane