No caption
IMG_7358.JPG
Details
Friday, April 25, 2025 · 8:56 AM
39.39201, -120.02190· 1662m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/622sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.9680
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:25
GPSDestBearing301.8959
GPSDestBearingRefTrue North
GPSHPositioningError7.2207
GPSImgDirection301.8959
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp15:56:24
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-04-25T08:56:25.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.2805
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized842
SubSecTimeOriginal842
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with blue piping being installed down a slope. An excavator and a loader are positioned near the top center, and a backhoe is present at the trench's bottom. Surrounding the trench are trees and rocky soil with visible railroad tracks in the background. Construction materials and equipment are staged around the work area.
trenching
rocky soil with open trench cloudy conditions equipment and materials staged around site
Safety features are not prominently visible in the frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingpipe-installation
excavator
4m
pipeline installation
pipeline-installationpipe-laying
shovel
4m
trenching
trenchingexcavation
excavator
5m
site grading
site-gradingvegetation
5m
trenching
caution-tape-installationsafety-marking
shovel
5m
trenching
trenchingexcavating
excavator
6m
site grading
site-gradingslope-work
lift or machinery near trees
6m
site grading
site-gradingearth
earth
7m
pipeline installation
pipeline-installationpipe-laying
pipe installation tool
7m
pipeline installation
piping-installationtrenching
excavator