No caption
IMG_7771.JPG
Details
Tuesday, May 13, 2025 · 3:07 PM
39.39205, -120.02191· 1650m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/539sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.7153
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:13
GPSDestBearing220.8671
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection220.8671
GPSImgDirectionRefT
GPSSpeed0.3241
GPSSpeedRefK
GPSTimeStamp22:7:50
HostComputeriPhone 16 Pro
latitude39.3921
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-05-13T15:07:52.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.0744
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized084
SubSecTimeOriginal084
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image displays a graded sloped area with exposed soil, possibly recently worked on. There are trees and small vegetation outlining the area, indicating a forested environment. No construction equipment or materials are visibly present in the frame. The soil surface appears disturbed, suggesting recent grading activity.
site-grading
graded soil on slope overcast lighting clear access around the slope area
No safety features are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingconduit-installations
shovel
5m
trenching
trenchingpipe-installation
excavator
5m
trenching
trenchingpipeline-installation
excavator
5m
site grading
site-gradinggravel
gravel
5m
site grading
site-gradingdirt-work
gravel
7m
trenching
trenchingexcavation
excavator
7m
swppp erosion control
rock-liningslope-stabilization
hand-trowel
7m
pipeline installation
pipeline-installationpipe-laying
pipe installation tool
8m
pipeline installation
pipeline-installationpipe-laying
shovel
8m
site grading
site-gradingearthwork