IMG_7286.JPG

No caption

IMG_7286.JPG

Tags

Details

Monday, April 21, 2025 · 12:12 PM

39.39211, -120.02171· 1660m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1534sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.9188
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:21
GPSDestBearing232.5878
GPSDestBearingRefTrue North
GPSHPositioningError25.1322
GPSImgDirection232.5878
GPSImgDirectionRefT
GPSSpeed1.3022
GPSSpeedRefK
GPSTimeStamp19:12:57
HostComputeriPhone 16 Pro
latitude39.3921
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-04-21T12:12:58.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5828
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized827
SubSecTimeOriginal827
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image shows a worker in a trench installing or positioning blue pipes. The worker is wearing a hard hat, hi-vis vest, and work boots. There are several blue pipes already laid in a trench, and a traffic cone is placed near the trench edge. The terrain is uneven, with the trench cutting through a slope in a wooded area.

pipeline-installation
dirt trench in a sloped terrain clear conditions with natural daylight slope may limit access
PPE is visible with an open trench hazard present.

Equipment & Materials

Analyzed Apr 21, 2026