No caption
IMG_7468.JPG
Details
Wednesday, April 30, 2025 · 1:37 PM
39.39211, -120.02174· 1556m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2762sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.8558
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:04:30
GPSDestBearing247.2804
GPSDestBearingRefTrue North
GPSHPositioningError25.1961
GPSImgDirection247.2804
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:37:22
HostComputeriPhone 16 Pro
latitude39.3921
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-04-30T13:37:22.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.4317
Software18.5
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized702
SubSecTimeOriginal702
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench where a worker is standing near blue pipes. An excavator is located on the edge of the trench, suggesting recent or ongoing excavation activities. The trench appears to be in a wooded area, and the ground is primarily dirt and scattered rocks.
trenching
dirt and rocky partly cloudy daylight slope and trench access
Basic PPE is visible, but no additional trench safety controls are observable.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
pipeline installation
pipe-installationtrenching
shovel
4m
trenching
trenchingexcavation
excavator
4m
pipeline installation
trenchingpipe-laying
excavator
7m
trenching
trenchingexcavation
excavator
9m
excavation
excavationsloped-excavation
excavator
10m
site grading
soil-disturbancegrading
trucks
10m
backfill
trench-backfillhand-tool-use
shovel
11m
trenching
conduit-installationtrench-work
excavator
11m
site grading
site-gradingdirt-work
gravel
11m
site grading
site-gradinggravel
gravel