No caption
IMG_6757.JPG
Details
Friday, March 21, 2025 · 3:01 PM
39.39111, -120.02133· 1681m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/5714sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.9085
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:03:21
GPSDestBearing194.4248
GPSDestBearingRefTrue North
GPSHPositioningError5.3021
GPSImgDirection194.4248
GPSImgDirectionRefT
GPSSpeed0.6568
GPSSpeedRefK
GPSTimeStamp22:1:3
HostComputeriPhone 16 Pro
latitude39.3911
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-03-21T15:01:03.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.4804
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized607
SubSecTimeOriginal607
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavator working on a gravel or dirt surface near a mountainside. A truck and a camera on a tripod are positioned nearby. A worker in a hi-vis vest is carrying a yellow case. It appears to be overcast with snow visible on the surrounding hills.
excavation
gravel or dirt overcast with snow on hills clear, with ample space for equipment
Hi-vis vests are visible, but no other safety controls are noted in the frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
swppp erosion control
erosion-controlsite-stabilization
straw-wattles
1m
site grading
vegetation-clearingsite-preparation
1m
site grading
land-clearingdebris-pile
vegetation
1m
swppp erosion control
erosion-controlrunoff-management
straw-wattles
1m
survey layout
survey-setupsurvey-layout
cat excavator
2m
swppp erosion control
ground-preparationsoil-piles
soil
2m
swppp erosion control
erosion-control-installationsediment-control-fence
excavator
2m
swppp erosion control
erosion-controlsediment-barrier-installation
excavator
4m
swppp erosion control
swppperosion-control
roller-compactor
5m
excavation
crane-operationconcrete-foundation
crane