No caption
IMG_6724.JPG
Details
Thursday, March 20, 2025 · 3:56 PM
39.39108, -120.02135· 1656m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/5319sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue10.1179
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:03:20
GPSDestBearing338.1425
GPSDestBearingRefTrue North
GPSHPositioningError78.5474
GPSImgDirection338.1425
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:56:37
HostComputeriPhone 16 Pro
latitude39.3911
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-03-20T15:56:40.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.3770
Software18.4
SubjectArea{"0":2853,"1":2145,"2":3145,"3":1886}
SubSecTimeDigitized021
SubSecTimeOriginal021
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an area with site grading activities indicated by the disturbed soil in the foreground. There is a pile of wood planks wrapped in packaging material positioned on the right side of the image. No workers or machinery are visible. The background consists of forested hills and clear skies.
site-grading
disturbed soil clear skies, daytime lighting materials staged on edge of work area
No safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
rebar formwork
rebar-assemblyformwork-construction
wheelbarrow
2m
mechanical installation
crane-liftingtank-placement
crane
3m
site grading
soil-compactionearth-moving
compactor
3m
site grading
site-gradingsoil-compaction
soil-compactor
4m
swppp erosion control
erosion-controlsite-staging
crane
5m
excavation
excavationsite-preparation
excavator
5m
site grading
land-clearingdebris-pile
vegetation
5m
site grading
vegetation-clearingsite-preparation
5m
swppp erosion control
erosion-controlrunoff-management
straw-wattles
5m
swppp erosion control
erosion-controlsite-stabilization
straw-wattles