No caption
IMG_8225.JPG
Tags
Details
Thursday, June 5, 2025 · 9:48 AM
39.39109, -120.02139· 1677m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1017sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.2582
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:06:05
GPSDestBearing58.2989
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection58.2989
GPSImgDirectionRefT
GPSSpeed0.1043
GPSSpeedRefK
GPSTimeStamp16:48:44
HostComputeriPhone 16 Pro
latitude39.3911
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-06-05T09:48:44.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.9905
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized541
SubSecTimeOriginal541
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a site with visible efforts related to SWPPP erosion control. A large cylindrical tank is being maneuvered with the assistance of a crane. Nearby, there is a freshly mulched area that appears to be part of erosion control measures. The site is surrounded by trees and is on a gently sloping terrain.
swppp-erosion-control
gravel and mulch clear skies, sunny open access with surrounding trees
No specific safety features are prominently visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
3m
site grading
site-gradingdirt-pile
earth
3m
swppp erosion control
swppperosion-control
bulldozer
3m
swppp erosion control
site-gradingerosion-control
gravel
4m
site grading
site-gradingwood-planks
wood-planks
4m
rebar formwork
rebar-assemblyformwork-construction
wheelbarrow
5m
other
material-deliverybundled-materials
flatbed truck
5m
mechanical installation
crane-liftingtank-placement
crane
6m
site grading
land-clearingdebris-pile
vegetation
6m
site grading
vegetation-clearingsite-preparation
6m
swppp erosion control
erosion-controlrunoff-management
straw-wattles