No caption
IMG_6540.JPG
Details
Tuesday, March 11, 2025 · 4:18 PM
39.39229, -120.02172· 1657m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2841sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue10.0721
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:11
GPSDestBearing114.3328
GPSDestBearingRefTrue North
GPSHPositioningError214.7307
GPSImgDirection114.3328
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp23:18:47
HostComputeriPhone 16 Pro
latitude39.3923
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-03-11T16:18:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.4721
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized075
SubSecTimeOriginal075
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a cleared and leveled gravel area, which may serve as a foundation or pad. The site is bounded by an earthen edge and surrounded by trees, suggesting a remote or forested location. A shadow indicates the presence of a camera or surveying equipment. No active work or workers are visible in the frame.
site-grading
gravel clear with sunlight open access with no visible congestion
No safety features are visible in the frame.
Analyzed Apr 21, 2026
Nearby Photos
site grading
gravel-layingsite-clearing
tripod
2m
other
site-preparationcylindrical-structure
loader
7m
pipeline installation
duct-bank-installationconduit-placement
loose soil
8m
site grading
site-gradingdirt
dirt
10m
site grading
soil-disturbancegrading
trucks
11m
backfill
trench-backfillhand-tool-use
shovel
12m
trenching
trenchingpipeline-work
excavator
13m
excavation
excavationearth-moving
excavator (inferred)
13m
swppp erosion control
erosion-control-installationslope-stabilization
erosion-control-mats
15m
trenching
trenchingtrench