No caption
IMG_9040.JPG
Details
Wednesday, July 30, 2025 · 3:22 PM
39.39233, -120.02164· 1678m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/813sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.3848
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:30
GPSDestBearing263.4212
GPSDestBearingRefTrue North
GPSHPositioningError77.5050
GPSImgDirection263.4212
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:22:46
HostComputeriPhone 16 Pro
latitude39.3923
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-07-30T15:22:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.6671
Software18.6
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized271
SubSecTimeOriginal271
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a section of a jobsite with visible site-grading activities. The ground has distinct areas of dirt and gravel with evident tracking marks, likely from machinery. There are trees and vegetation on the edges of the cleared area. No heavy equipment or personnel are visible in the image.
site-grading
dirt and gravel with visible grading overcast lighting an open and accessible graded area
No specific safety features are visible in frame
Analyzed Apr 21, 2026
Nearby Photos
8m
site grading
site-preparationfoundation-grading
tripod
8m
site grading
gravel-layingsite-clearing
tripod
10m
other
site-preparationcylindrical-structure
loader
13m
pipeline installation
duct-bank-installationconduit-placement
loose soil
15m
trenching
trenchingpipeline-work
excavator
15m
backfill
trench-backfillhand-tool-use
shovel
17m
excavation
excavationearth-moving
tracked excavator
17m
site grading
soil-disturbancegrading
trucks
19m
site grading
road-gradinggravel-spreading
gravel
21m
excavation
excavationearth-moving
excavator (inferred)