No caption
IMG_1152.JPG
Details
Monday, October 27, 2025 · 1:04 PM
39.39223, -120.02185· 1615m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3891sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.6952
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:10:27
GPSDestBearing199.5532
GPSDestBearingRefTrue North
GPSHPositioningError77.1520
GPSImgDirection199.5532
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:4:48
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-10-27T13:04:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software26.0.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized715
SubSecTimeOriginal715
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Three workers are positioned on a slope, installing erosion control measures, possibly blankets or mats, across the slope. The area around them is vegetated with trees and shrubs, indicating a natural setting. Sunlight is visible, suggesting clear weather conditions. The slope is bare, likely prepared for stabilization measures.
swppp-erosion-control
bare soil slope clear weather with sunlight no visible access issues
Hi-vis vests are visible, but no additional safety controls or hazards are immediately visible.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
excavation
excavationearth-moving
excavator (inferred)
4m
site grading
gradingearthwork
dirt
8m
trenching
trenchingtrench
excavator
9m
site grading
soil-disturbancegrading
trucks
9m
trenching
trenchingtrench
10m
other
site-preparationcylindrical-structure
loader
11m
trenching
conduit-installationtrench-work
excavator
12m
pipeline installation
duct-bank-installationconduit-placement
loose soil
13m
site grading
gravel-layingsite-clearing
tripod
13m
site grading
site-preparationfoundation-grading
tripod