No caption
IMG_0628.JPG
Details
Thursday, October 2, 2025 · 9:38 AM
39.39689, -120.02015· 1694m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.0421
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:02
GPSDestBearing54.1259
GPSDestBearingRefTrue North
GPSHPositioningError7.2425
GPSImgDirection54.1259
GPSImgDirectionRefT
GPSSpeed1.3200
GPSSpeedRefK
GPSTimeStamp16:38:28
HostComputeriPhone 16 Pro
latitude39.3969
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0202
MeteringModePattern
ModifyDate2025-10-02T09:38:29.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.0
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized186
SubSecTimeOriginal186
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction site with a yellow excavator on the left side, adjacent to an orange safety fence. Inside the fenced area are several safety cones and a caution tape surrounding a rectangular section on the ground. A slope with retaining walls is visible in the background. The ground appears muddy, indicating recent rain.
other
muddy overcast limited access due to fencing and equipment
Safety controls such as barriers, cones, and caution tape are visible in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
5m
excavation
trenchingexcavation
gravel
5m
excavation
excavationtrenching
compactor
5m
trenching
trenchingtraffic-cone
soil
6m
trenching
trenchingjackhammer-operation
jackhammer
6m
electrical
electrical-installationelectrical-panel
soil
6m
trenching
pipe-installationtrenching
shovel
6m
trenching
trenchingexcavation
soil
6m
excavation
excavationsite-prep
shovel
7m
trenching
trenchingpipe-exposure
rusted pipes
7m
excavation
vault-installationpipe-installation
shovel