No caption
IMG_0442.JPG
Details
Tuesday, September 23, 2025 · 11:23 AM
39.39694, -120.02012· 1694m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/6173sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.3397
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:09:23
GPSDestBearing10.4405
GPSDestBearingRefTrue North
GPSHPositioningError15.2176
GPSImgDirection10.4405
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:23:13
HostComputeriPhone 16 Pro
latitude39.3969
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0201
MeteringModePattern
ModifyDate2025-09-23T11:23:16.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.5917
Software26.0
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized299
SubSecTimeOriginal299
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker using a jackhammer at the bottom of an open trench. The worker is wearing a hard hat and hi-vis vest. The trench appears to have a dirt surface, and a red hose is visible in the scene. There are no visible trench supports or shoring devices in place.
trenching
dirt bright sunlight congested due to trench work
Safety features such as PPE are visible, but trench shoring is not evident.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
pipe-installationtrenching
shovel
1m
excavation
trenchingexcavation
gravel
1m
trenching
trenchingexcavation
soil
1m
excavation
excavationtrenching
compactor
1m
trenching
trenchingpipe-exposure
rusted pipes
2m
excavation
excavationsite-prep
shovel
3m
other
excavationstructure-placement
concrete-structure
3m
trenching
trenchingexcavation
concrete
4m
swppp erosion control
gradingembankment-stabilization
compact-track-loader
4m
excavation
excavationtrenching
excavator