No caption
IMG_1797.JPG
Details
Wednesday, December 3, 2025 · 8:30 AM
39.39468, -120.02141· 1658m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/77sISO 320
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue2.7841
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:12:03
GPSDestBearing258.4324
GPSDestBearingRefTrue North
GPSHPositioningError41.5097
GPSImgDirection258.4324
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp16:30:47
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-12-03T08:30:51.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.2706
Software26.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized794
SubSecTimeOriginal794
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows excavation work taking place at a generator pad area. There is a visible trench with exposed soil and scattered rocks. An excavator is positioned at the far end of the trench, likely used for digging. A fence borders the site, and there's a building or structure partially visible to the right.
excavation
rocky soil with trench clear lighting limited access area with fencing
Safety features such as fencing are visible in the frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
other
sidingwindows
1m
pipeline installation
trenchingpipe-laying
off-road vehicle
2m
trenching
utility-locatingdepth-measurement
measuring-tape
2m
trenching
trench-depth-measurementutility-locating
measuring-tape
2m
pipeline installation
trenchingpipeline-installation
bulldozer
3m
site grading
site-preparationgrading
compactor
3m
excavation
pothole-utility-locatingmeasurement-taking
measuring-tape
3m
trenching
trenchingexcavation
compact track loader
3m
trenching
conduit-installationduct-bank-work
conduit-pipes
3m
excavation
pothole-utility-locatingexcavation
utility truck