No caption
IMG_1559.JPG
Details
Thursday, November 13, 2025 · 3:23 PM
39.39466, -120.02139· 1646m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/60sISO 320
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue1.4878
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:11:13
GPSDestBearing228.8978
GPSDestBearingRefTrue North
GPSHPositioningError19.2888
GPSImgDirection228.8978
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp23:23:19
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-11-13T15:23:21.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue5.9069
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized249
SubSecTimeOriginal249
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with a newly installed pipeline in a water treatment area. The piping appears to be connected with couplings and is situated adjacent to a building foundation. Excavated soil is visible around the trench, and a bulldozer is parked nearby.
pipeline-installation
soil with visible trench overcast daylight open access with machinery present
Safety features are minimal, with only work boots visible and an open trench present without visible barriers.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
site grading
site-preparationgrading
compactor
1m
mechanical installation
hose-handlingequipment-setup
construction-vehicle
2m
trenching
trenchingexcavation
compact track loader
2m
pipeline installation
trenchingpipe-laying
off-road vehicle
2m
excavation
excavationtrenching
excavator
3m
trenching
conduit-installationduct-bank-work
conduit-pipes
3m
pipeline installation
pipeline-installationtrench-work
construction machinery
4m
other
sidingwindows
4m
trenching
trenchingexcavation
excavator
4m
trenching
trench-depth-measurementutility-locating
measuring-tape