No caption
IMG_7694.JPG
Details
Friday, May 9, 2025 · 9:24 AM
39.39152, -120.02138· 1673m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3279sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.2661
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:09
GPSDestBearing308.5290
GPSDestBearingRefTrue North
GPSHPositioningError15.4896
GPSImgDirection308.5290
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp16:24:3
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-05-09T09:24:04.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.6789
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized216
SubSecTimeOriginal216
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with multiple conduits neatly aligned at the bottom. The trench is cut into a slope with surrounding trees indicating a natural setting. Sunlight casts shadows on the site, suggesting a clear day. Some roots and rough terrain are visible along the trench edges.
pipeline-installation
cut slope with trench clear daylight conditions trench is part of an open work area with some natural slopes
No visible safety controls or PPE are present in the frame.
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
soil-disturbancehillside-excavation
1m
swppp erosion control
slope-stabilizationerosion-control
wood-chips
2m
swppp erosion control
slope-stabilizationerosion-control
wood-chips
2m
trenching
trenchingexcavation
soil
2m
trenching
trenchingpiping
gas canister
2m
site grading
site-clearingdirt
2m
site grading
excavationsite-clearing
excavator
2m
swppp erosion control
erosion-controlswppp-installation
straw wattles
2m
site grading
site-gradingerosion-control
vibratory-compactor
2m
trenching
trenchingexcavation
loose soil