IMG_0972.JPG

No caption

IMG_0972.JPG

Tags

Details

Thursday, October 16, 2025 · 3:18 PM

39.39150, -120.02139· 1683m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1613sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.2000
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:16
GPSDestBearing355.7559
GPSDestBearingRefTrue North
GPSHPositioningError3.4976
GPSImgDirection355.7559
GPSImgDirectionRefT
GPSSpeed0.7002
GPSSpeedRefK
GPSTimeStamp22:18:25
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-10-16T15:18:26.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.6554
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized726
SubSecTimeOriginal726
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image shows a site-grading operation on a sloped area with a compacted soil surface. A straw erosion control measure is laid parallel to the slope on the left. A vibratory plate compactor is present on the right side of the image. The area appears to be prepared for further construction work or surface stabilization.

site-grading
sloped terrain with compacted soil clear weather with natural lighting ample clear area for equipment movement
No active safety features or PPE visible in frame.

Analyzed Apr 21, 2026