No caption
IMG_7744.JPG
Details
Monday, May 12, 2025 · 10:10 AM
39.39225, -120.02204· 1656m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1250sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.9923
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:12
GPSDestBearing222.7145
GPSDestBearingRefTrue North
GPSHPositioningError81.3279
GPSImgDirection222.7145
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:10:44
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0220
MeteringModePattern
ModifyDate2025-05-12T10:10:45.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.2877
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized142
SubSecTimeOriginal142
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A person in orange attire is using a handheld device next to a piece of soil testing equipment placed on a dirt surface. An orange bucket with tools is nearby, and another person is in the background working on the slope. The area appears to be a cleared dirt path with uneven ground.
survey-layout
dirt path with uneven ground overcast clear access along path
PPE like hi-vis vests is visible, with uneven ground posing a hazard.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
6m
trenching
trenchingpipe-preparation
excavator
7m
excavation
excavationearth-moving
excavator
8m
pipeline installation
pipe-installationhillside-work
hand-tools
9m
pipeline installation
duct-bank-installationconduit-laying
soil
10m
trenching
trenchingutility-marking
excavator
10m
trenching
trenchingtrench
excavator
10m
mechanical installation
tank-installationmechanical-assembly
crane
10m
mechanical installation
tank-installationmechanical-work
crane
13m
site grading
gradingearthwork
dirt
14m
pipeline installation
duct-bank-installationinspection
concrete-junction-box