No caption
IMG_8716.JPG
Details
Thursday, July 10, 2025 · 9:26 AM
39.39188, -120.02213· 1646m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 125
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue4.4668
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:10
GPSDestBearing303.1431
GPSDestBearingRefTrue North
GPSHPositioningError12.7120
GPSImgDirection303.1431
GPSImgDirectionRefT
GPSSpeed0.0486
GPSSpeedRefK
GPSTimeStamp16:26:16
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0221
MeteringModePattern
ModifyDate2025-07-10T09:26:17.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized423
SubSecTimeOriginal423
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows conduit pipes being installed in a trench area. A worker using a power drill is visible on the left side. Several conduit pipes are connected to a concrete structure, indicating that conduit installation work is ongoing. Gravel or soil surrounds the pipes, suggesting recent backfill activities.
trenching
soil with backfilled gravel clear daylight conditions trench access with soil piled around
Safety features like PPE are minimally visible; open trench presents a potential hazard.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
excavationsoil-removal
power tool
1m
swppp erosion control
erosion-controlsediment-control
straw-wattles
2m
site grading
site-clearingslope-preparation
construction equipment with visible roof
2m
other
drillingsurface-excavation
drill
2m
excavation
excavationsoil
excavator
2m
pipeline installation
conduit-installationduct-bank-work
hand tool
2m
pipeline installation
duct-bank-installationconcrete-form-handling
excavator
2m
pipeline installation
pipe-layingtrenching-work
front-loader
3m
site grading
earthmovingsite-preparation
excavator
3m
pipeline installation
conduit-installationjunction-box-connection
soil