No caption
IMG_8715.JPG
Details
Thursday, July 10, 2025 · 9:26 AM
39.39191, -120.02214· 1647m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.2498
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:10
GPSDestBearing319.5705
GPSDestBearingRefTrue North
GPSHPositioningError2.4039
GPSImgDirection319.5705
GPSImgDirectionRefT
GPSSpeed0.8352
GPSSpeedRefK
GPSTimeStamp16:26:3
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0221
MeteringModePattern
ModifyDate2025-07-10T09:26:05.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized264
SubSecTimeOriginal264
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker dressed in high-visibility gear working with several conduits entering a junction box. The installation appears to be part of a duct bank setup. The worker is positioned on uneven ground, and there is soil around the site. The environment is outdoors with daylight illuminating the scene.
pipeline-installation
uneven soil surface daylight limited access, worker kneeling
Worker is wearing PPE including a hard hat, hi-vis vest, and work boots. No additional safety controls visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
swppp erosion control
erosion-controlrock-placement
track-based construction machinery
2m
excavation
excavationrock-placement
excavator
2m
pipeline installation
duct-bank-installationconcrete-form-handling
excavator
2m
pipeline installation
conduit-installationduct-bank-work
hand tool
2m
excavation
excavationsite-preparation
excavator
3m
swppp erosion control
erosion-controlsediment-control
straw-wattles
3m
excavation
excavationsoil-removal
power tool
3m
pipeline installation
pipe-layingtrenching-work
front-loader
3m
trenching
conduit-installationtrenching
power-drill
3m
trenching
trenchingsafety-marking
excavator