No caption
IMG_9057.JPG
Details
Thursday, July 31, 2025 · 9:04 AM
39.39187, -120.02211· 1646m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/99sISO 400
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue2.9709
BrightnessValue2.6303
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0027
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:07:31
GPSDestBearing24.9002
GPSDestBearingRefTrue North
GPSHPositioningError4.9338
GPSImgDirection24.9002
GPSImgDirectionRefT
GPSSpeed0.2410
GPSSpeedRefK
GPSTimeStamp16:4:24
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0221
MeteringModePattern
ModifyDate2025-07-31T09:04:25.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6312
Software18.6
SubjectArea{"0":2004,"1":1412,"2":2211,"3":1337}
SubSecTimeDigitized364
SubSecTimeOriginal364
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker operating a drill on an exposed soil and rock surface. The drill has a distinctive purple attachment and is used near the base of a rock face. It appears that material is being excavated or processed from the surface. The worker is wearing work boots and blue jeans, standing on loose, granular soil.
other
loose granular soil and rock unknown due to close-up adequate access for drilling
Some PPE like work boots are visible in frame, but other safety controls are not visible.
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
conduit-installationtrenching
power-drill
2m
pipeline installation
pipe-layingtrenching-work
front-loader
2m
site grading
site-clearingslope-preparation
construction equipment with visible roof
2m
site grading
earthmovingsite-preparation
excavator
2m
site grading
excavationgrading
excavator
3m
excavation
excavationsoil-removal
power tool
3m
trenching
conduit-installationtrenching
pvc-conduits
3m
swppp erosion control
erosion-controlsediment-control
straw-wattles
3m
excavation
excavationsoil
excavator
3m
trenching
trenchingsafety-marking
excavator