No caption
IMG_9061.JPG
Details
Thursday, July 31, 2025 · 11:13 AM
39.39192, -120.02216· 1644m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/303sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.0100
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:31
GPSDestBearing175.0688
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection175.0688
GPSImgDirectionRefT
GPSSpeed0.1538
GPSSpeedRefK
GPSTimeStamp18:13:29
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-07-31T11:13:30.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.2411
Software18.6
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized744
SubSecTimeOriginal744
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows excavation work where large rocks are being arranged on a slope, likely for erosion control. A person in a hi-vis vest and hard hat stands near a small excavator on a dirt path. The excavator is positioned next to the rocks, suggesting placement work. The area is in a natural setting with trees and uneven ground.
excavation
dirt path with rocks and uneven ground sunny and clear accessible via dirt path
Safety equipment such as hard hats, hi-vis vests, and work boots are visible, but no additional safety controls are seen.
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
excavationsite-preparation
excavator
2m
swppp erosion control
erosion-controlrock-placement
track-based construction machinery
2m
pipeline installation
conduit-installationjunction-box-connection
soil
4m
pipeline installation
conduit-installationduct-bank-work
hand tool
4m
pipeline installation
duct-bank-installationconcrete-form-handling
excavator
4m
trenching
trenchingduct-bank-installation
excavator
4m
swppp erosion control
erosion-controlsediment-control
straw-wattles
5m
excavation
excavationsoil-removal
power tool
5m
trenching
trenchingpipe-laying
soil
5m
trenching
trenchingsafety-marking
excavator