No caption
IMG_8712.JPG
Details
Thursday, July 10, 2025 · 9:14 AM
39.39196, -120.02215· 1645m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/545sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.6776
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:10
GPSDestBearing137.3729
GPSDestBearingRefTrue North
GPSHPositioningError14.2700
GPSImgDirection137.3729
GPSImgDirectionRefT
GPSSpeed0.2617
GPSSpeedRefK
GPSTimeStamp16:14:38
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0221
MeteringModePattern
ModifyDate2025-07-10T09:14:39.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.0892
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized152
SubSecTimeOriginal152
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trenching operation near a hillside, with a person working inside the trench. An excavator is parked nearby, and caution tape is laid in the trench. The area consists of soil and rocky terrain. This appears to be part of a duct bank installation for a finished water tank project.
trenching
soil and rocky terrain bright and clear weather open area with direct access
PPE such as hi-vis vests are visible and caution tape is used to mark the trench.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingpipe-laying
soil
3m
excavation
excavationsite-preparation
excavator
3m
trenching
trenchinghillside-trenching
dirt
4m
excavation
excavationrock-placement
excavator
4m
swppp erosion control
erosion-controlwattle
telehandler
5m
excavation
excavationtrenching
excavator
6m
pipeline installation
conduit-installationjunction-box-connection
soil
6m
swppp erosion control
erosion-controlrock-placement
track-based construction machinery
7m
trenching
trenchingsafety-marking
excavator
7m
trenching
trenchingtrench
excavator