No caption
IMG_0819.JPG
Details
Thursday, October 9, 2025 · 12:09 PM
39.39131, -120.02125· 1691m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/8130sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.8422
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:09
GPSDestBearing320.5920
GPSDestBearingRefTrue North
GPSHPositioningError7.8950
GPSImgDirection320.5920
GPSImgDirectionRefT
GPSSpeed0.1063
GPSSpeedRefK
GPSTimeStamp19:9:4
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-09T12:09:07.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.9891
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized432
SubSecTimeOriginal432
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with conduit pipes being installed, alongside two concrete utility boxes. The trench runs across a dirt site with a vehicle in the background. The surrounding area consists of piles of dirt and some gravel surface. No personnel are visible in the image.
trenching
dirt and gravel surface with open trench clear weather with natural lighting open access with visible vehicle and material laydown
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
site grading
site-gradingwater-tank
excavator
1m
site grading
site-gradinggrading-operations
excavator
1m
mechanical installation
component-hoistinginstallation-work
crane
1m
excavation
worker-entryconcrete-structure-access
bucket
2m
pipeline installation
conduit-installationduct-bank-assembly
shovel
2m
trenching
trenchingduct-bank-installation
compact excavator
2m
rebar formwork
formwork-constructionfoundation-preparation
toolbox
2m
rebar formwork
rebar-installationformwork-assembly
drill
2m
trenching
trenchingwarning-tape-laying
backhoe
2m
pipeline installation
pipeline-installationvalve-installation
soil