No caption
IMG_0966.JPG
Details
Thursday, October 16, 2025 · 1:19 PM
39.39133, -120.02126· 1681m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/2439sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue2.9709
BrightnessValue10.4371
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0013
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:10:16
GPSDestBearing322.6829
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection322.6829
GPSImgDirectionRefT
GPSSpeed3.1832
GPSSpeedRefK
GPSTimeStamp20:19:32
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-10-16T13:19:33.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.2521
Software26.0.1
SubjectArea{"0":2009,"1":1504,"2":2221,"3":1329}
SubSecTimeDigitized430
SubSecTimeOriginal430
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Pipelines are shown laid in an excavation trench with red valve assemblies at several connection points. The pipes are blue, and they are partially wrapped in white material at the joints and bends. The soil is visibly packed around the pipes, suggesting stabilization or preparation for backfilling.
pipeline-installation
soil around trench sunny lighting visible clear access to trench area
No safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
concrete work
formwork-constructionfoundation-preparation
shovel
1m
excavation
worker-entryconcrete-structure-access
bucket
1m
rebar formwork
formwork-constructiontank-foundation
pipe-wrench
2m
concrete work
concrete-deliverymixing
concrete mixer truck
2m
concrete work
formwork-constructiontank-foundation-setup
utility-vehicle
2m
rebar formwork
formwork-installationwooden formwork
construction truck
2m
trenching
trenchingconduit-installation
heavy machinery
3m
site grading
site-gradingwater-tank
excavator
3m
trenching
trenchingwarning-tape-laying
backhoe
3m
pipeline installation
conduit-installationduct-bank-assembly
shovel