No caption
TC_00003.JPG
Details
Friday, April 11, 2025 · 8:48 AM
39.39130, -120.02126· 1686m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/490sISO 64
Flash did not fire, auto mode
Show all EXIF (40 fields)
ApertureValue2.2750
BrightnessValue8.0645
ColorSpace1
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.2.1
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp1915:01:00
GPSDOP4.7487
GPSHPositioningError4.7487
GPSSpeed4.8112
GPSSpeedRefK
GPSTimeStamp15:48:36
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-04-11T08:48:41.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.9365
SoftwareTimestamp Camera
SubjectArea{"0":2015,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized944
SubSecTimeOriginal944
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts the construction of a circular tank foundation with workers assembling rebar formwork. Lumber supports and wooden planks are arranged in a radial pattern. Two workers wearing PPE are on the structure. There are piles of steel rods and a tool box on the ground.
rebar-formwork
rocky and gravelly soil overcast lighting with natural daylight adequate on-site space, no congestion visible
PPE such as hard hats and hi-vis vests are visible, but no other safety controls are present in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
rebar formwork
rebar-installationformwork-assembly
drill
1m
mechanical installation
component-hoistinginstallation-work
crane
1m
site grading
site-gradingearthmoving
excavators
1m
site grading
site-gradingwater-tank
excavator
2m
trenching
trenchingconduit-installation
heavy machinery
2m
site grading
site-gradinggrading-operations
excavator
2m
trenching
trenchingduct-bank-installation
compact excavator
2m
mechanical installation
tank-installationcrane-operation
crane
2m
other
crane-operationsite-preparation
crane
2m
site grading
site-gradingearthwork
tracked-loader