TC_00003.JPG

No caption

TC_00003.JPG

Tags

Details

Friday, April 11, 2025 · 8:48 AM

39.39130, -120.02126· 1686m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/490sISO 64
Flash did not fire, auto mode
Show all EXIF (40 fields)
ApertureValue2.2750
BrightnessValue8.0645
ColorSpace1
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.2.1
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp1915:01:00
GPSDOP4.7487
GPSHPositioningError4.7487
GPSSpeed4.8112
GPSSpeedRefK
GPSTimeStamp15:48:36
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-04-11T08:48:41.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.9365
SoftwareTimestamp Camera
SubjectArea{"0":2015,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized944
SubSecTimeOriginal944
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image depicts the construction of a circular tank foundation with workers assembling rebar formwork. Lumber supports and wooden planks are arranged in a radial pattern. Two workers wearing PPE are on the structure. There are piles of steel rods and a tool box on the ground.

rebar-formwork
rocky and gravelly soil overcast lighting with natural daylight adequate on-site space, no congestion visible
PPE such as hard hats and hi-vis vests are visible, but no other safety controls are present in the frame.

Analyzed Apr 21, 2026