No caption
IMG_0824.JPG
Details
Thursday, October 9, 2025 · 2:02 PM
39.39133, -120.02123· 1664m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/6711sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue10.2425
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:09
GPSDestBearing318.1809
GPSDestBearingRefTrue North
GPSHPositioningError15.1244
GPSImgDirection318.1809
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:2:45
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-09T14:02:46.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.7124
Software26.0.1
SubjectArea{"0":268,"1":909,"2":222,"3":223}
SubSecTimeDigitized067
SubSecTimeOriginal067
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows two workers in an excavated trench area laying down red warning tape. The trench runs diagonally across the image with the surrounding area consisting of soil. A backhoe is visible on the right. Utility boxes and a white bucket are positioned near the trench.
trenching
soil and trench bright sunlight clear access with slight congestion of materials
Safety equipment like hard hats, vests, and boots are worn by workers. Caution tape is visible, but the trench remains open.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
pipeline installation
conduit-installationduct-bank-assembly
shovel
1m
rebar formwork
formwork-installationwooden formwork
construction truck
2m
valve vault
concrete-applicationvalve-vault-installation
shovel
2m
concrete work
formwork-constructiontank-foundation-setup
utility-vehicle
2m
excavation
worker-entryconcrete-structure-access
bucket
2m
rebar formwork
formwork-setupfooting-preparation
wood
2m
trenching
trenchingconduit-installation
heavy machinery
2m
excavation
compactingfoundation-preparation
compactor
2m
excavation
compactionexcavation
plate compactor
2m
site grading
site-gradinggrading-operations
excavator