No caption
IMG_9762.JPG
Details
Wednesday, August 27, 2025 · 11:48 AM
39.39470, -120.02112· 1655m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/709sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.9617
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:08:27
GPSDestBearing285.5747
GPSDestBearingRefTrue North
GPSHPositioningError56.0382
GPSImgDirection285.5747
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:48:15
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-08-27T11:48:16.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.4701
Software18.6.1
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized686
SubSecTimeOriginal686
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A trench is being prepared with a worker using a compactor in the middle of the work area. An excavator is positioned nearby, along with a skid steer loader at the far end. Loose soil is spread around the trench, suggesting recent excavation work.
trenching
pavement with trench and soil daylight, sunny open access with some equipment present
PPE is visible but no other specific safety controls are noted in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingexcavation-work
mini excavator
0m
excavation
pothole-utility-locatingpotholing
measuring tape
1m
paving surface restoration
road-markingsurface-assessment
cars
2m
survey layout
utility-markingsurvey-layout
fiber bundle markings
2m
excavation
pothole-excavationutility-locating
2m
pipeline installation
pipeline-installationindoor-construction
gravel
2m
trenching
trenchingexcavation
excavator
2m
survey layout
line-alignmentutility-pole
parked-cars
2m
paving surface restoration
surface-preparationequipment-staging
excavator
3m
pipeline installation
pipeline-installationpipe-assembly
hand tool (uncertain type)