No caption
IMG_1548.JPG
Details
Thursday, November 13, 2025 · 9:14 AM
39.39467, -120.02148· 1656m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/40sISO 1250
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue-1.1244
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:11:13
GPSDestBearing112.6941
GPSDestBearingRefTrue North
GPSHPositioningError86.3101
GPSImgDirection112.6941
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:14:28
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0215
MeteringModePattern
ModifyDate2025-11-13T09:14:32.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue5.3219
Software26.0.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized301
SubSecTimeOriginal301
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an area with visible exposed soil and uneven ground, indicating ongoing excavation work. A concrete wall is positioned in the background with a box placed beside it. A person is visible with a measuring tape, suggesting site measurements. The environment seems to be indoors with artificial lighting.
excavation
exposed soil and uneven ground indoor artificial lighting congestion due to cardboard boxes on floor
No specific safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingroad-work
bulldozer
2m
trenching
trenchingexcavation
excavator
3m
trenching
trenchingpipeline-installation
excavator
4m
trenching
trenchingexcavation
excavator
4m
excavation
pothole-utility-locatingmeasurement-taking
measuring-tape
4m
excavation
pothole-utility-locatingexposed-pipe
exposed-pipe
4m
trenching
trenching-activitypipe-handling
hand-tool
4m
paving surface restoration
compactionroad-repair
plate-compactor
4m
paving surface restoration
road-maintenancesurface-stabilization
construction vehicle
4m
trenching
trenchingpipe-placement
skid-steer