No caption
IMG_0693.JPG
Details
Friday, October 3, 2025 · 1:26 PM
39.39238, -120.02261· 1636m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/901sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.2309
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:03
GPSDestBearing43.6611
GPSDestBearingRefTrue North
GPSHPositioningError8.5427
GPSImgDirection43.6611
GPSImgDirectionRefT
GPSSpeed1.0388
GPSSpeedRefK
GPSTimeStamp20:26:25
HostComputeriPhone 16 Pro
latitude39.3924
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-10-03T13:26:26.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.8152
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized557
SubSecTimeOriginal557
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a construction area with visible site grading activity. A dirt pile is situated on the left side next to a path, which leads past several parked trucks and construction materials. To the right, miscellaneous items such as trailers, pallets, and a shipping container are staged. The setting is surrounded by trees and sloped terrain.
site-grading
graded dirt path overcast access appears adequate with visible material laydown
Safety features are not visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
2m
site grading
site-gradingcompactor
compactor
2m
site grading
site-gradingroadwork
excavator
3m
pipeline installation
pipe-layingtrenching
pipes
4m
trenching
trenchinglogs
4m
trenching
trenchingearth-disturbance
construction vehicle
5m
site grading
site-gradingheavy-equipment
roller
5m
pipeline installation
duct-bank-installationconduit-pipes
white-truck
5m
survey layout
survey-layoutequipment-setup
surveying-equipment
5m
site grading
soil-compactionsite-preparation
tractor
7m
excavation
excavationboulder