No caption
IMG_7799.JPG
Details
Thursday, May 15, 2025 · 3:44 PM
39.39234, -120.02263· 1639m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2232sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.6924
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:15
GPSDestBearing354.3213
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection354.3213
GPSImgDirectionRefT
GPSSpeed0.7904
GPSSpeedRefK
GPSTimeStamp22:44:42
HostComputeriPhone 16 Pro
latitude39.3923
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-05-15T15:44:43.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.1242
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized959
SubSecTimeOriginal959
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An open trench cuts through a hillside, bordered by earth and rock. Yellow caution tape surrounds the area, and logs are visible near the tree line. A construction vehicle is partially visible in the background. The scene depicts active earth disturbance, with trenching work as the primary activity.
trenching
rocky and uneven soil with an open trench clear skies with daylight partially obstructed by earth materials and logs
Caution tape marks the trench to indicate potential hazards.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
pipeline installation
duct-bank-installationconduit-pipes
white-truck
4m
site grading
site-gradingcompactor
compactor
4m
site grading
site-gradingdirt-pile
trucks
5m
pipeline installation
pipe-layingtrenching
pipes
6m
site grading
site-gradingroadwork
excavator
7m
trenching
trenchinglogs
8m
site grading
site-gradingheavy-equipment
roller
8m
swppp erosion control
slope-stabilizationerosion-control
erosion-control-blankets
9m
excavation
excavationboulder
9m
survey layout
survey-layoutequipment-setup
surveying-equipment