No caption
IMG_0679.JPG
Details
Friday, October 3, 2025 · 10:27 AM
39.39416, -120.02469· 1617m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1464sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.9730
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:03
GPSDestBearing195.8904
GPSDestBearingRefTrue North
GPSHPositioningError142.2629
GPSImgDirection195.8904
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:27:21
HostComputeriPhone 16 Pro
latitude39.3942
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0247
MeteringModePattern
ModifyDate2025-10-03T10:27:24.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5158
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized017
SubSecTimeOriginal017
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a graded dirt pathway with visible machinery tracks running through a mountainous landscape. To the left, various construction materials and equipment are staged, including a shipping container and scaffolding structures. Pine trees line the landscape with mountains visible in the background.
site-grading
graded dirt with machinery tracks partly cloudy materials and equipment staged on the left
Safety features are not visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
4m
site grading
earthworksite-grading
loader
11m
excavation
soil-compactionslope-stabilization
tamping-tool
24m
backfill
soil-compactiontrench-stabilization
compactor
27m
site grading
gradingbackfilling
excavator
29m
pipeline installation
pipeline-installationtrenching
toolbox
29m
pipeline installation
pipeline-installationtrenching
toolbox
32m
pipeline installation
blow-off-installationpipeline-assembly
access-pipe
39m
backfill
soil-compactionbackfill
jumping-jack-compactor
40m
trenching
trenchingexcavation
excavator
42m
pipeline installation
pipeline-installationtrenching
excavator