No caption
IMG_0726.JPG
Details
Monday, October 6, 2025 · 8:47 AM
39.39412, -120.02438· 1617m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue4.5165
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:06
GPSDestBearing67.3059
GPSDestBearingRefTrue North
GPSHPositioningError122.8316
GPSImgDirection67.3059
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp15:46:59
HostComputeriPhone 16 Pro
latitude39.3941
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0244
MeteringModePattern
ModifyDate2025-10-06T08:47:00.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized724
SubSecTimeOriginal724
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker shoveling earth in a forested area, likely performing grading or backfill work. There is an excavator on the right, and piles of earth and debris can be seen around the site. The area has uneven ground with rocks and soil. The worker is wearing a hi-vis vest and jeans, and the site is surrounded by trees and natural terrain.
site-grading
uneven ground with soil and rocks daylight natural terrain with some debris
Hi-vis vest is visible; no other safety controls are apparent in frame.
Analyzed Apr 21, 2026
Nearby Photos
6m
backfill
soil-compactiontrench-stabilization
compactor
7m
pipeline installation
pipeline-installationtrenching
toolbox
7m
pipeline installation
pipeline-installationtrenching
toolbox
13m
backfill
soil-compactionbackfill
jumping-jack-compactor
15m
trenching
trenchingexcavation
excavator
15m
pipeline installation
pipeline-installationtrenching
excavator
20m
site grading
earth-movingsite-clearing
earth-moving machine
21m
site grading
site-gradingearthmoving
bulldozer
23m
site grading
earthworksite-grading
loader
27m
site grading
site-gradingshipping-container