No caption
IMG_1163.JPG
Details
39.39416, -120.02424· 1631m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Show all EXIF (43 fields)
AI Analysis
The image features a leveled and compacted soil area with a protruding capped pipe in the center. A jumping jack compactor is positioned to the left side, indicating soil compaction activity. A rake is visible near the compactor, suggesting manual grading or leveling work. The surrounding terrain includes loose soil and vegetation.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
8m
site grading
10m
pipeline installation
13m
site grading
13m
trenching
14m
backfill
16m
pipeline installation
16m
pipeline installation
17m
trenching
19m
site grading
20m
pipeline installation