Thursday, September 11, 2025 · 2:21 PM
39.39490, -120.02135· 139m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2024sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.8587
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:11
GPSDestBearing357.2755
GPSDestBearingRefTrue North
GPSHPositioningError49.1529
GPSImgDirection357.2755
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:21:40
HostComputeriPhone 16 Pro
latitude39.3949
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-09-11T14:21:43.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.9832
Software26.0
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized060
SubSecTimeOriginal060
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an open trench with excavation work in progress, located next to a partially collapsed road. Two workers are present, one standing and another inside the trench, indicating active work. A pile of soil is visible in a dump truck bed nearby. Water bottles are scattered on the ground, and the road surface is visibly cracked and damaged.
trenching
cracked and damaged road surface with open trench sunny daylight conditions visible soil pile in dump truck bed
Standard PPE is visible, including hard hats and hi-vis vests. An open trench presents visible hazards.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
swppp erosion control
erosion-controlsite-preparation
dirt
4m
trenching
pipeline-inspectiontrenching
hand tool
7m
other
site-accessdirt-path
8m
swppp erosion control
surface-preparationerosion-control
gravel
9m
excavation
pothole-measurementutility-locating
backhoe-loader
10m
trenching
trenchingexcavation
skid-steer
10m
trenching
utility-locatingtrench-measuring
excavator
10m
other
roofingplywood-installation
plywood
11m
site grading
site-gradingskid-steer-loader
skid-steer-loader
12m
trenching
trenchingexcavation
skid steer